Client Request:
***Description at Below***
Location:
Alma, Penang.
Property Type / Area of Work:
Double Storey Semi-D / Dry Kitchen Area
Completion Date:
January 2014
_____________________________________
ART WORK (COMPLETED)
Phase 1 : Create a new dry kitchen area to accommodate a bowl type sink for washing hand. Client would like to try having a place for notebook and a cup of coffee or tea while cooking or around kitchen area.
Phase 2 : Sudden change of plan and decided not to have space for notebook. Plan to maximize storage area. A cabinet is then scheduled at our factory to fill the void area.
Phase 3 : Something is missing!! What about the microwave?? A tall cabinet is constructed to accommodate microwave and also a storage area above the microwave. To ensure everything is in perfect order, a display cabinet is manufactured and installed side by side with the tall cabinet to have an even connection for total project.
Phase 4 : Not so classy. No worries. A 5mm thick black glass for kitchen top would do the trick. Wow!! A big difference before and after. Economical yet provide the wanted effect.
* The entire project is manufactured using solid plywood for internal structure and high pressurised decorative lamination for exterior finishing. Better durability.
_________________________________
For further inquiries to obtain a practical design for your project and good carpentry workmanship, do give us a call at 016-5576703 (Johnny, Chief Designer of JX Design and Renovation) or keep in touch with us at jxdesign2013@gmail.com